cavendish

Lab app · The work

Everything the lab is doing.

Experiments and support work are different classes and stay that way — one has a hypothesis and a kill condition, the other has a counterpart team and a deliverable. Neither is what anybody actually does on a Tuesday. Underneath both sits the same thing: a harness somebody has to build, an eval somebody has to write, a dataset somebody has to get cleared, and a write-up somebody has to sign.

16
11 experiments, 5 with other teams
3
of 11 open · 3 blocked
111d
28d of it against no objective
16
1 linked without asking, 11 already settled
Kind of work16 of 27

Every run by stage with its owner, pair, days in stage and overruns visibly ageing, and beside it the other half — work done with somebody else, which has a counterpart and a deliverable instead of a hypothesis. This is what the lab is doing, and it opens here because a board is readable in a second and a grouped list is not.

First time here. Nothing is marked new — everything would be, and that is not information.

Proposed

hypothesis, kill condition, cost

3

Voting

Type 3 and 4 only · scores locked before discussion

3

Running

own harness, findings logged from the session

5

Measuring

evals, measurement runs

3

Concluded

one of five terminal states

6

The other half

Work done with somebody else.

Standing up the gateway, model access with procurement, making AI-SDLC repeatable. No hypothesis and no kill condition — a counterpart team and a deliverable instead, so it gets its own columns rather than being bent into a run. Handed over is the success state: work the lab still owns a year later has failed at the thing it was for.

Experiments vs everything else62%

8 experiments in flight against 5 open contributions, 84 days committed. The charter protects experiment time structurally; a floor of 50% is where that stops being a slogan.

Stalled · 1

Model and tool approval with Procurement. Waiting on lifecycle accountability, which the plan dates to September and nobody has yet claimed. The lab can supply the evaluation method and cannot decide who signs. Carrying it as active would have been dishonest and would have hidden the ask.

Identified1

Spotted, not yet agreed to. Costs nothing until somebody commits.

  • C.1Building
    MLwith Platform Engineering
Committed1

The lab has agreed to be the dependency, with an owner and an effort against it.

  • 2.2Evaluating4d
    MLwith Partnerships
Active3

In flight, drawing on the same attention the shortlist does.

  • C.1Building34d
    DYwith Platform Engineering, Security30d quiet
  • 2.3Convening11d
    AWwith Partnerships, Procurement23d quiet
  • 3.1Advising26d
    MMwith Engineering, Internal transformation squad16d quiet
Handed over1

The thing exists and somebody else runs it. This is the success state.

  • A.2Building22d
    ATwith Finance

Identified costs nothing until somebody commits, which is the point of the column: the plan names the lab as a dependency on more initiatives than it can carry, and taking them silently is how a lab ends up running four things it never agreed to. Attribution to an objective is a commit with a name on it, because it is how budget gets justified.

2026-09-03